S1138 (2027) The Hire, Erection and Dismantling of Scaffold Services
Northern Ireland Electricity Networks Limited · published 30 Oct 2026
- Deadline
- 3 Dec 2026, 12:00 · questions by 3 Dec 2026, 12:00
- Estimated value
- £4,800,000 excluding VAT where stated
- Procedure
- Competitive flexible procedure · above threshold · sets up a framework
- Contract dates
- 29 Dec 2027 to 28 Dec 2031
- Where
- Northern Ireland
- Categories (CPV)
- 44212310 Scaffolding
- 45500000 Hire of construction and civil engineering machinery and equipment with operator
- 44212315 Equipment for scaffolding
- 44212317 Scaffolding structures
- 45262100 Scaffolding work
- 45262110 Scaffolding dismantling work
- 45262120 Scaffolding erection work
- 98390000 Other services
- Lots
- 2 lots
- Lot 1 - Hire, Erection and Dismantling of Scaffold (Distribution Overhead lines) — £2,400,000
- Hire, Erection and Dismantling of Scaffold (Distribution and Transmission Substations and Transmission Overhead Lines) — £2,400,000
- Small businesses
- The buyer marks this as suitable for SMEs.
- Award criteria
- Quality (quality)30%
- Price (price)70%
Description
NIE Networks now wishes to award a Framework Agreement for Hire, Erection and Dismantling of Scaffold. These services will include the activities detailed below.
• Undertaking pre-site assessments by suitably trained and competent personnel to determine scaffold requirements and develop the necessary design, planning and safety documentation.
• Preparation of all required scaffold designs, design calculations, engineering assessments, drawings, certifications and associated testing, where applicable.
• Preparation, implementation and maintenance of task-specific Risk Assessments and Method Statements (RAMS) for all scaffold-related activities.
• The provision, delivery, erection, alteration, inspection, maintenance, hire and dismantling of scaffolding required to support works including, but not limited to:
1. The construction, replacement, maintenance and refurbishment of electricity poles, towers and associated infrastructure;
2. Low Voltage overhead lines, service cables and equipment associated with customers' properties;
3. Fault and Emergency response activities;
4. Substation buildings, structures, plant, equipment, switchgear and associated apparatus maintenance, refurbishment and installation works.
• Provision of all labour, supervision, materials, plant, equipment, transport and ancillary resources necessary to safely design, install, maintain, inspect, alter and dismantle scaffolding.
• Ensuring all scaffolding is designed, erected, altered, maintained and dismantled in accordance with current legislation, applicable standards, manufacturer's requirements and industry best practice.
• Provision of suitably qualified, trained and competent personnel for scaffold design, inspection, supervision and erection activities.
• Completion of scaffold inspections, Following erection and prior to first use. At intervals not exceeding seven (7) days thereafter. Following any alteration, modification, adverse weather event, impact, or other circumstance that may affect the scaffold's strength, stability or safety.
• Providing inspection records, certifications and scaffold status information as required by NIE Networks.
• Any other activities, services or support reasonably necessary for the safe and effective delivery of the Services described within this Specification. The Services shall be divided into Lots as per below; Lot 1 - Hire, Erection and Dismantling of Scaffold (Distribution Overhead lines) Lot 2 - Hire, Erection and Dismantling of Scaffold (Distribution and Transmission Substations and Transmission Overhead Lines)
Deciding whether to bid?
Upload the tender pack and get a brief with every pass/fail requirement quoted from the documents, the scoring model and the questions you must answer. The first brief is free.