Skip to content
Early notice

FCDO Accra British High Commission Offices Redevelopment, Ghana

Foreign, Commonwealth and Development Office · published 13 Nov 2026

Tender expected
20 Nov 2026
Market engagement until
1 Jul 2026
Estimated value
£10,791,000 excluding VAT where stated
Procedure
Procedure not stated · above threshold
Contract dates
3 Jun 2027 to 1 Nov 2030
Where
Outside the UK
Categories (CPV)
  • 45210000 Building construction work
Small businesses
The buyer marks this as suitable for SMEs.

Description

Project Overview

1.1 The route to market being considered is the Competitive Flexible Procedure. This will comprise of a Request to Participate stage with Conditions of Participation questions and an Invitation to Tender stage.

1.2 The scope of the project is to redevelop two existing sites, to accommodate the British High Commission. The British High Commission (Ghana) estate is made up of two sites that sit side by side. It is located on Julius Nyerere Link Road in a reasonably affluent and central part of Accra, close to Parliament, the Presidency and some Ministries. The office estate in Accra is tired and in poor condition (in places), having suffered from a lack of strategic investment and maintenance.

1.3 It is anticipated that the consturction will take place in phases. Work will start at the Volta site which will be vacant throughout construction (staff normally based at this site will be temporarily moved to the Afadja Site). Once construction works at the Volta site are complete, all of the staff at the Afadja site will be transferred to the Volta site to enable the phase 2 works to be undertaken in the unoccupied Afadja building.

1.4 In line with the overall estate strategy, the intention is to have the Volta HC Office staff move to the Afadja High Commission for the duration of the Volta construction period.

1.5 The existing sites comprises of:

• An existing split-site office building. It is proposed that the Volta building be retained and refurbished.

• Existing plant structures to be demolished to make way for new extension.

• Existing external landscaping to be demolished in some areas to make way for new cloister and walkway.

1.6 Part of the site development design includes:

• Undertaking minor works to the existing Afadja site to make suitable to be used as a decant property whilst works to the Volta building are undertaken.

• Refurbish the existing building to a fit-for-purpose, open plan office standard.

• Replacement of existing mechanical and electrical installations.

• Seismic strengthening and associated structural works.

• External works to create shared internal and external spaces.

1.7 The Contractor, as well as any engaged sub-contractors, are required to perform all work in accordance with the relevant UK Standards. The construction must meet established UK standards throughout the build process.

2. It is anticipated that the works will be undertaken under the NEC form of contract; ECC 4, Option A (Priced Contract with an Activity Schedule).

3. The project team is also considering the inclusion of an Early Contractor Involvement stage ahead of the construction stage. Both stages will be within the same contract.

4. Some areas of the building will be classified as higher security and will require a separate specialist contractor. These works will not form part of this requirement/contract. However, the parameter and interface between the higher classified areas and the works within this requirement will require security cleared personnel at Security Check (SC*) level and a Project Manager at Developed Vetting (DV*) level to manage the works. Contractor’s will need to be able to provide such personnel before the works contract can begin. *SC and DV* is a process of security vetting. Further details can be found at https://www.gov.uk/government/publications/united-kingdom-security-vetting-clearance-levels/national-security-vetting-clearance-levels#security-check-sc.

5. Below is a schedule of key market engagement and tendering activities (subject to change): Activity Date Submit PME questionnaire Response 23rd February 2026

1:1 Discussions with Bidders W/C 2nd March 2026 Issue PSQ mid- November 2026 Issue ITT early February 2027 Bidders day During ITT period Proposed Bid Deadline End of March 2027 Contract Award June 2027

Notices for this procurement

  1. 13 Nov 2026 · Preliminary market engagement notice (update)107795-2026 (opens in a new tab)
  2. 5 Nov 2026 · Preliminary market engagement notice (update)105112-2026 (opens in a new tab)
  3. 23 Oct 2026 · Preliminary market engagement notice (update)100288-2026 (opens in a new tab)

Deciding whether to bid?

Upload the tender pack and get a brief with every pass/fail requirement quoted from the documents, the scoring model and the questions you must answer. The first brief is free.