Preliminary market engagement notice092658-2026
Zero-Capex Solar PV & Battery EnergyStorage System (BESS) Energy-as-a-Service Project, Wansbeck General Hospital
- Market engagement closes
- Published1 Oct 2026
- Estimated value
- Value not published
- Contract term
- 1 Apr 2027 to 31 Mar 2041 (14 years)
- Lots
- Not divided into lots
- Categories
- 09330000Solar energy
- 09332000Solar installation
- 09331000Solar panels
- Regions
- UK-wide
The buyer’s description
“The Trust aims to ensure the existing on-site energy centre is used as efficiently and effectively as possible in a manner that reduces energy costs and carbon emissions. The Trust is therefore seeking to install a battery storage and solar PV solution at Wansbeck General Hospital with the following requirements:
- A containerised, modular system fort he Battery Storage capable of relocation and expansion, if required.
- A cost model whereby the Trust makes no capital investment and pays no ongoing servicing/operational costs and the Trust is paid a fixed percentage of the savings or a flat annual fee.
- Integration with the Trust’s HV network and any future renewables.
- Measurement and verification services to demonstrate performance of the installed solution and the associated savings achieved.”